{"id":1059,"date":"2019-01-24T16:01:11","date_gmt":"2019-01-24T15:01:11","guid":{"rendered":"https:\/\/www.vdpsrl.it\/progetto\/herambiente-waste-treatment-plants\/"},"modified":"2024-09-09T11:03:22","modified_gmt":"2024-09-09T09:03:22","slug":"herambiente-waste-treatment-plants","status":"publish","type":"progetti","link":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/","title":{"rendered":"Herambiente &#8211; waste treatment plants"},"content":{"rendered":"<p>DESCRIPTION OF THE PROJECT<\/p>\n<p>The activities concern the verification of acoustic compatibility and the representation of the environmental acoustic climate generated by the production activities of the waste treatment plants \/ compartments managed by Herambiente S.p.A. in relation to the surrounding areas and to the presence of residential and \/ or sensitive receptors.<\/p>\n<p>The study is conducted through acoustic measurements carried on field and, in some cases, also through a special forecasting program for the propagation of noise. The activities carried out concern, for each treatment plant:<\/p>\n<p>&middot; Acquisition of municipal acoustic classification plans; &middot; acquisition and analysis of specific authorization requirements; &middot; characterization of internal noise sources; &middot; detection of source operating modes; &middot; detection of noise at the perimeter of the plant; &middot; detection of noise on external housing receptors ; &middot; verification of compliance with the acoustic input and emission limits, as indicated in the acoustic zoning; &middot; verification of compliance with the limits of the differential criterion; &middot; technical and descriptive report of the activities.<\/p>\n<p>The acoustic measurements are both long-lasting, with control units working continuously from a minimum of 24 hours to a maximum of two weeks, and short, with operator-assisted survey in two intervals, one during the day and one at night with reference to one or more days.<\/p>\n<p>The phonometric measurements are carried out with third-octave frequency analysis to check for the presence of tonal components.<\/p>\n<p>STUDY SPECIFICITY<\/p>\n<p>The work concerns 23 plants distributed mainly in Emilia-Romagna region, some of which are investigated more than once during the year.<\/p>\n<p>The phonometric surveys are carried out using up to a maximum of eight sound level meters simultaneously .<\/p>","protected":false},"excerpt":{"rendered":"<p>DESCRIPTION OF THE PROJECT The activities concern the verification of acoustic compatibility and the representation of the environmental acoustic climate generated by the production activities of the waste treatment plants \/ compartments managed by Herambiente S.p.A. in relation to the surrounding areas and to the presence of residential and \/ or sensitive receptors. The study&#8230;<\/p>\n","protected":false},"featured_media":3530,"menu_order":124,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"settore":[31],"class_list":["post-1059","progetti","type-progetti","status-publish","format-standard","has-post-thumbnail","hentry","settore-energy-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Herambiente - waste treatment plants - VDP Srl<\/title>\n<meta name=\"description\" content=\"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Herambiente - waste treatment plants - VDP Srl\" \/>\n<meta property=\"og:description\" content=\"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/\" \/>\n<meta property=\"og:site_name\" content=\"VDP Srl\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-09T09:03:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/03\/VDP_uffici_home-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1902\" \/>\n\t<meta property=\"og:image:height\" content=\"793\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/\",\"name\":\"Herambiente - waste treatment plants - VDP Srl\",\"isPartOf\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg\",\"datePublished\":\"2019-01-24T15:01:11+00:00\",\"dateModified\":\"2024-09-09T09:03:22+00:00\",\"description\":\"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage\",\"url\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg\",\"contentUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg\",\"width\":1600,\"height\":1207},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.vdpsrl.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.vdpsrl.it\/en\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Herambiente &#8211; waste treatment plants\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#website\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/\",\"name\":\"VDP srl\",\"description\":\"Progettiamo per la sostenibilit\u00e0 ambientale\",\"publisher\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vdpsrl.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#organization\",\"name\":\"VDP srl\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg\",\"contentUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg\",\"caption\":\"VDP srl\"},\"image\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/vdp-srl\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Herambiente - waste treatment plants - VDP Srl","description":"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/","og_locale":"en_US","og_type":"article","og_title":"Herambiente - waste treatment plants - VDP Srl","og_description":"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.","og_url":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/","og_site_name":"VDP Srl","article_modified_time":"2024-09-09T09:03:22+00:00","og_image":[{"width":1902,"height":793,"url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/03\/VDP_uffici_home-1.jpg","type":"image\/jpeg"}],"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/","url":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/","name":"Herambiente - waste treatment plants - VDP Srl","isPartOf":{"@id":"https:\/\/www.vdpsrl.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage"},"image":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg","datePublished":"2019-01-24T15:01:11+00:00","dateModified":"2024-09-09T09:03:22+00:00","description":"Acoustic impact assessment and acoustic impact assessment forecast through the application of simulation models for the waste treatment plants \/ compartments managed by Herambiente S.p.A.","breadcrumb":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#primaryimage","url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg","contentUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/herambiente-impianti-trattamento-rifiuti-1.jpg","width":1600,"height":1207},{"@type":"BreadcrumbList","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/herambiente-waste-treatment-plants\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.vdpsrl.it\/en\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.vdpsrl.it\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Herambiente &#8211; waste treatment plants"}]},{"@type":"WebSite","@id":"https:\/\/www.vdpsrl.it\/en\/#website","url":"https:\/\/www.vdpsrl.it\/en\/","name":"VDP srl","description":"Progettiamo per la sostenibilit\u00e0 ambientale","publisher":{"@id":"https:\/\/www.vdpsrl.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vdpsrl.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vdpsrl.it\/en\/#organization","name":"VDP srl","url":"https:\/\/www.vdpsrl.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg","contentUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg","caption":"VDP srl"},"image":{"@id":"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/vdp-srl\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti\/1059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti"}],"about":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/types\/progetti"}],"version-history":[{"count":0,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti\/1059\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/media\/3530"}],"wp:attachment":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/media?parent=1059"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/settore?post=1059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}