{"id":7297,"date":"2025-04-14T12:57:47","date_gmt":"2025-04-14T10:57:47","guid":{"rendered":"https:\/\/www.vdpsrl.it\/?post_type=progetti&#038;p=7297"},"modified":"2025-12-04T11:06:50","modified_gmt":"2025-12-04T10:06:50","slug":"environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline","status":"publish","type":"progetti","link":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/","title":{"rendered":"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline"},"content":{"rendered":"\n<p><strong>DESCRIPTION OF THE PROJECT<\/strong><\/p>\n\n\n\n<p>This contract includes all activities relating to the monitoring of environmental requirements at the construction site for the construction of the 380 kV overhead power line in a single backhoe loader Patern\u00f2 \u2013 Priolo section Patern\u00f2 \u2013 Pantano and for the new Pantano d&#8217;Arci Electricity Station.<\/p>\n\n\n\n<p>The activities carried out by the IACA (Environmental Construction Site Assistant Officer) were:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>In-depth examination of environmental requirements at the destination construction site;<\/li>\n\n\n\n<li>Supervision of compliance with environmental compliance planning based on the planning of individual processes;<\/li>\n\n\n\n<li>Updating of environmental compliance planning during reviews of the general construction site planning;<\/li>\n\n\n\n<li>Support to the Director of Works for environmental aspects;<\/li>\n\n\n\n<li>Support for companies operating on the construction site, for issues that relate to current legislation and good environmental practice on the construction site;<\/li>\n\n\n\n<li>Drafting and archiving of \u201cconstruction site documentation\u201d of an environmental nature;<\/li>\n\n\n\n<li>Prompt reporting of any environmental critical issues encountered and proposal of a plan for their elimination;<\/li>\n\n\n\n<li>Verification of the implementation of the various construction site preparations envisaged in the Procurement Specifications (for example, installation of noise barriers, preparation of eco-boxes, specific measures for cutting vegetation, etc.);<\/li>\n\n\n\n<li>Presiding over the different measurement activities of Environmental Monitoring.<\/li>\n<\/ul>\n\n\n\n<p><strong>STUDY SPECIFICITY\u2019<\/strong><\/p>\n\n\n\n<p>The control of construction site activities and requirements was for the following environmental sectors:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Waste;<\/li>\n\n\n\n<li>Excavated earths and rocks;<\/li>\n\n\n\n<li>Dangerous substances and accidental spills;<\/li>\n\n\n\n<li>Meteor waters, ind. and reg.;<\/li>\n\n\n\n<li>Atmospheric emissions, dust and sediments;<\/li>\n\n\n\n<li>Ambient noise.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DESCRIPTION OF THE PROJECT This contract includes all activities relating to the monitoring of environmental requirements at the construction site for the construction of the 380 kV overhead power line in a single backhoe loader Patern\u00f2 \u2013 Priolo section Patern\u00f2 \u2013 Pantano and for the new Pantano d&#8217;Arci Electricity Station. The activities carried out by&#8230;<\/p>\n","protected":false},"featured_media":6737,"menu_order":68,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"footnotes":""},"settore":[31],"class_list":["post-7297","progetti","type-progetti","status-publish","format-standard","has-post-thumbnail","hentry","settore-energy-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl<\/title>\n<meta name=\"description\" content=\"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl\" \/>\n<meta property=\"og:description\" content=\"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/\" \/>\n<meta property=\"og:site_name\" content=\"VDP Srl\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-04T10:06:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"669\" \/>\n\t<meta property=\"og:image:height\" content=\"414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/\",\"name\":\"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl\",\"isPartOf\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg\",\"datePublished\":\"2025-04-14T10:57:47+00:00\",\"dateModified\":\"2025-12-04T10:06:50+00:00\",\"description\":\"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage\",\"url\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg\",\"contentUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg\",\"width\":669,\"height\":414},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.vdpsrl.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.vdpsrl.it\/en\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#website\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/\",\"name\":\"VDP srl\",\"description\":\"Progettiamo per la sostenibilit\u00e0 ambientale\",\"publisher\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vdpsrl.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#organization\",\"name\":\"VDP srl\",\"url\":\"https:\/\/www.vdpsrl.it\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg\",\"contentUrl\":\"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg\",\"caption\":\"VDP srl\"},\"image\":{\"@id\":\"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/vdp-srl\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl","description":"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/","og_locale":"en_US","og_type":"article","og_title":"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl","og_description":"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).","og_url":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/","og_site_name":"VDP Srl","article_modified_time":"2025-12-04T10:06:50+00:00","og_image":[{"width":669,"height":414,"url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg","type":"image\/jpeg"}],"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/","url":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/","name":"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline - VDP Srl","isPartOf":{"@id":"https:\/\/www.vdpsrl.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage"},"image":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg","datePublished":"2025-04-14T10:57:47+00:00","dateModified":"2025-12-04T10:06:50+00:00","description":"Construction site environmental assistant, overhead power line 380 kV SE Patern\u00f2 (CT) and the future E.S. Priolo Gargallo (SR).","breadcrumb":{"@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#primaryimage","url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg","contentUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2025\/04\/1.jpg","width":669,"height":414},{"@type":"BreadcrumbList","@id":"https:\/\/www.vdpsrl.it\/en\/projects\/environmental-assistant-at-the-construction-site-paterno-priolo-electric-pipeline\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.vdpsrl.it\/en\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.vdpsrl.it\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Environmental Assistant at the Construction Site \u2013 Patern\u00f2-Priolo Electric Pipeline"}]},{"@type":"WebSite","@id":"https:\/\/www.vdpsrl.it\/en\/#website","url":"https:\/\/www.vdpsrl.it\/en\/","name":"VDP srl","description":"Progettiamo per la sostenibilit\u00e0 ambientale","publisher":{"@id":"https:\/\/www.vdpsrl.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vdpsrl.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vdpsrl.it\/en\/#organization","name":"VDP srl","url":"https:\/\/www.vdpsrl.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg","contentUrl":"https:\/\/www.vdpsrl.it\/wp-content\/uploads\/2024\/10\/logo-vdpsrl.svg","caption":"VDP srl"},"image":{"@id":"https:\/\/www.vdpsrl.it\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/vdp-srl\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti\/7297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti"}],"about":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/types\/progetti"}],"version-history":[{"count":2,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti\/7297\/revisions"}],"predecessor-version":[{"id":7299,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/progetti\/7297\/revisions\/7299"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/media\/6737"}],"wp:attachment":[{"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/media?parent=7297"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.vdpsrl.it\/en\/wp-json\/wp\/v2\/settore?post=7297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}