Project Details
Client:
Apulia Airports
Location:
Bari Palese Airport
Project date:
2010 - 2014
Sectors:
Related service:
Amount:
168.130.000,00
State of activity:
Positive opinion by MATTM Decree no.
DM-0000277 of 19/11/2014
Project Details
PROJECT DESCRIPTION
Activities conducted for Bari Airport started with a Preliminary Study for the EIA procedure for the new airport development plan to 2020 for Bari Airport “Karol Woytila,” set as an environmental pre-feasibility.
Subsequently, the actual Environmental Impact Study of the updated Master Plan proposal was developed, with a time scenario to the year 2022.
The development of low-cost traffic and, in general, of movements at Bari Airport, resulted in the need to revise the traffic forecasts already expected for the Airport.
This is one of the main reasons behind the update of the Airport Development Plan (Master Plan), which was redefined based on the time scenario to the year 2022.
SPECIFICITY OF THE STUDY
The Master Plan was prepared in accordance with the “Guidelines for the Drafting of Airport Development Plans” (ENAC), so it takes into account issues related to the general urban framework in relation to Transportation, Territorial and Sector Plans, landscape and environmental constraints, relationship with connecting infrastructure on the territory and the description of constraints.
Complementary objectives of the Master Plan 2022 are:
The infrastructure interventions included in the Master Plan 2022 are: